Puppeteer

Author Topic: Ashwamegh 25/2 : we are CLOSE now !  (Read 698 times)

Engineer

  • Newbie
  • *
  • Posts: 4
    • View Profile
Re: Ashwamegh 25/2 : we are CLOSE now !
« Reply #15 on: January 13, 2019, 02:08:32 AM »
What I said was perfectly clear to me knowing what I was attempting but not at all accurately describing what is happening.  Shame on me.  What I should have said that the rack now moves sufficiently to fuel well past full load but is not near the limits of the rack travel.  This is an enormous improvement over the 2 and a bit kw that was available before the mods.  I sorry for the awkward and misleading wording of my previous post.