Puppeteer

Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Topics - lister-IRL

Pages: [1]
1
Hi Guys

I'm a newbie to the forum.  I purchased a Lister ST2 air cooled with 7kVA generator, 7 years ago, a good price at 700Euro.  My plan was always to integrate it into an off grid electrical system, to that end we have installed a 4kW solar array and a 1kW windturbine is being added by the end of the Summer.  We have a 800Ah battery bank and at present, with just the solar array, it runs the house for 9/12 months of the year, hoping with the addition of the wind turbine this allow us to run the house off grid for 12/12 with the exception of approximately 2 weeks in the year when there is practically no sun or wind, this is where the Lister will come into its own.

IrishLights, decommissioned this generator, when they automated many lighthouses around the coast, converting them to Solar.  The generator has done very few hours, and starts easily on the first turn of the crank.

The plan for the Lister is to take the output from the generator and feed it into a 5kW inverter, which will charge the battery bank at up to 120Amps and the remaining power will power the house, when the generator is running.  A battery monitor will be programmed to trigger an ATS signal when the batteries drop to 70% and start the engine.

I have sourced this generator box to replace the orignal startup control box, which was not available when I purchased the Lister. 

This was the recommended module for the Lister here: https://www.gencontrol.co.uk/files/105_myv2558d.pdf

It will come with 2 bypass power relays 12V 40A to operate the starter motor and fuel solenoid valve. The module will use the existing starter motor and fuel solenoid. I understand these must be present on the generator and in working order (starter motor & fuel solenoid). The module has an auto start input which could also be used for ATS connection from the battery monitor e.g. trigger startup at 70% battery level.

I have attached pictures of the current electrics on the generator and hoping someone will know how I can wire the system, to achieve this.  I'm also about to purchase 2 x 12v (24v in total) to start the engine.  I'm willing to offer money, up to 200e to anyone who can help me get the engine automated and integrated into the current system.

Pages: [1]